Migori CAIP Animal Feeds Processing Equipment: Supply, Installation, Training, 2-Year Support (MITI/SDI/008)
Official title: Supply, Delivery, Installation, Commissioning, Testing, Training and Two (2) Year Technical Support for Migori County Aggregation Industrial Parks (CAIPs) Animal Feeds Processing Equipment
- Closing
- Fri 30 Oct 2026, 11:00 am EAT
- Tender number
- MITI/SDI/008/2026-2027
- Procuring entity
- Industrialization
- التصنيف
- Goods · Open Tender
- County
- Migori
Official documents take precedence. NairobiCity is an independent information service, not the procuring entity or a government body. This summary was prepared from the official documents with AI assistance; every requirement was matched to the document wording, but it can still contain mistakes. Before you apply, read the official tender documents and any addenda.
What is being bought
Supply, delivery, installation, commissioning, testing, training and two-year technical support for animal feeds processing equipment for the Migori County Aggregation Industrial Parks (CAIPs), with final destination Migori County, Kenya. Equipment quantities are in the Schedule of Requirements, which was not fully reviewed.
What could disqualify you
- Tenders must be tape bound, not spiral bound. Spiral bound documents, or documents in box files, are automatically disqualified. D2 p.2
- Late tenders will be rejected. D2 p.2
- Electronic tenders are not permitted. Tenders must be delivered in person in a sealed envelope. D4 p.2
- A tender without a valid tender security of KES 2,500,000 is non-responsive at preliminary evaluation. D2 p.33
- A tender tax compliance certificate with Invalid or Withdrawn status leads to automatic disqualification. D2 p.33
- Audited financial statements submitted without the auditor's current practising license lead to automatic disqualification. D2 p.33
- Bidders not meeting all mandatory preliminary requirements are non-responsive and are not evaluated further. Technical score below 70 out of 100 is non-responsive. D2 p.36
- Documents in a foreign language must be translated and notarized; otherwise the bid fails preliminary evaluation. D2 p.33
- A bidder that provides false or misleading information will be disqualified. D2 p.38
Key facts
- Closing
-
Fri 30 Oct 2026, 11:00 am
Closing deadline after addenda: Friday 30 October 2026 at 11:00 am East African Time; deliveries must be received by this time. D4 p.2 - Bid / tender security
- Tender security of KES 2,500,000 issued by a reputable financial institution recognized by the Central Bank of Kenya, valid for 287 days from the tender opening date, in the form of the tender security form (Option 1 demand bank guarantee or Option 2 insurance guarantee). D2 p.29
- Tender fee
- Not stated in the documents we reviewed Not stated D2 p.2
- Site visit
-
اختياري
Pre-tender site meeting listed for 7 October 2026 at 10am at the Migori County CAIP site. The same TDS says the pre-arranged site visit will not be held; attendance is encouraged. Conflicting D2 p.27 - Pre-bid meeting
-
اختياري
No separate pre-bid meeting is stated. Clarification questions must reach the Procuring Entity in writing by 13 October 2026. D2 p.27 - Reserved for
- Open tender; no reservation to women, youth, persons with disabilities or AGPO groups is stated. The portal lists no reserved groups. D2 p.2
- Contract value
- Not stated in the documents we reviewed Not stated P
- Tender opening
- Tenders are opened immediately after the deadline at NSSF Building, Block A, 23rd floor Boardroom. The TDS (unrevised page) states an opening date of 23 October 2026, which conflicts with the revised closing. Conflicting D4 p.2
- Tender validity
- Tenders remain valid for 287 days from the date of tender opening. D4 p.2
Who can apply
Application checklist
Tick items off as you prepare. Your ticks stay on this device only.
Required from every bidder
- D2 p.33
- D2 p.33
- D2 p.33
- D2 p.33
- D2 p.33
- D2 p.33
- D2 p.33
- D2 p.33
- D2 p.33
- D2 p.28
- Standard rule D2 p.4
Required only in some situations
Experience, licences and financial capacity
Technical
- Equipment must meet minimum technical specifications; a technical compliance schedule must be completed and supported by documents. D2 p.34
- Delivery within 4 months from contract signing (scored: 4 months or less scores 5 marks, longer scores zero). D2 p.35
- Warranty of 2 years and spare parts for at least two years with preventive and corrective maintenance during a two-year support period. D2 p.101
- Pre-inspection before shipment is required. D2 p.101
- Equipment must be delivered and installed at the Migori County CAIP site, including solar panels and water circulation systems. D2 p.101
- Technical evaluation: score out of 100; minimum 70 needed to proceed to financial evaluation. D2 p.34
Financial
How and where to submit
- Physical hard copy tender in a sealed envelope marked with tender name and number, addressed to the Principal Secretary, delivered to the tender box at NSSF Building, Block A, Eastern Wing, 16th floor, Bishops Road, Nairobi. D4 p.3
- Original tender plus one copy. D2 p.29
- Pages must be numbered in sequence including the cover page, and the document must be tape bound. D2 p.2
- Tenders must be in English only. D2 p.2
- Tender currency is Kenya Shillings and must be inclusive of all applicable taxes. D2 p.2
- Completed tender documents must be enclosed in plain sealed envelopes marked with the tender name and number. D1 p.1
What the addenda changed
Points to confirm with the procuring entity
The documents do not agree with each other on these points. Ask the procuring entity for a written clarification before you submit.
- Pre-tender site visit: TDS says a pre-tender site meeting is held 7 Oct 2026 at 10am at the Migori CAIP site, but the same TDS says the pre-arranged site visit will not be held. The addendum refers to scheduled site visits and encourages attendance. (D2 p.27 (ITT 8.1); D3 p.1 (item 2))
- Opening date: Revised closing is 30 Oct 2026 11:00; the unrevised TDS states opening on 23 Oct 2026 at 11:00 while the revised document says tenders open immediately after the deadline. (D2 p.29 (ITT 28.6); D4 p.2 (item 6); D3 p.1)
- Similar experience requirement: Preliminary check requires one similar completed project; due diligence requires at least two similar contracts; technical scoring asks for four similar projects in the last 10 years. (D2 p.33 (MR13); D2 p.38 (post-qualification 1); D2 p.34-35 (technical criterion 3))
Not covered in the documents we reviewed
- Contract value and budget are not stated.
- Tender fee or any payment for documents is not stated in the reviewed pages.
- Revised TDS and Section II pages of the revised document (D4) were not reviewed; opening and site visit details should be checked there.
- Schedule of Requirements and equipment quantities (Section VII) were only partly reviewed.
- Minimum average annual turnover and cash-flow amounts in Section III Financial Situation are blank in the reviewed text.
- Forms (Form of Tender, Tender Security form, CON-2, FIN-3.1) and the Certificate of Independent Tender Determination were not fully reviewed.
- Performance security amount and the standstill period details beyond the 14-day standstill were not fully reviewed.
- Confirm which site visit applies (7 Oct 2026 meeting or no visit) with the procuring entity.
Terms explained
- TDS
- Tender Data Sheet: the tender-specific section that overrides the general Instructions to Tenderers.
- Tender security
- Money or guarantee submitted with the bid to show the bidder will honour it; here KES 2,500,000, forfeited if the bidder withdraws or fails to sign.
- OEM
- Original Equipment Manufacturer; the bidder needs its written authorization to supply the equipment.
- Responsive / non-responsive
- A bid that meets all mandatory requirements is responsive; one that fails any mandatory item is rejected before scoring.
- JV
- Joint venture: two firms bidding together under an agreement or letter of intent; here limited to two members.
- CR12 / CR13